The System
A copy of the specification is passed to the local authority (for Moscow area is included in Mosenergo). The document must contain information about the released of electrical power and the conditions of its provision. The latter include: the electricity supply, including contingency plan for the location of connection objects (the site plan, buildings and connecting transmission lines from the place of connection, for example, electric poles) scheme of the external and internal power supply indicating the types of protective equipment, sections and brands of cables and wires, the calculated currents, metering of electricity, the place of accession to the mains; situational plan layout of electrical equipment, cables and wires grounding devices inside the building; specification electrical products and materials; calculation capacity Mains and Electrical. Depending on local conditions, project requirements may include other items, or may contain different wording. (As a rule, the validity of tu is one year.
If during this period the system was not undeveloped, the developer will have to obtain new specifications.) Prior to the start of the project coordinated with the regional office . Along with this, in that stipulated or implied by default by the contractor. In his role may make only those organizations that possess relevant state licenses. In addition, the document may 'insist' on the tests. The company, which carries them, also must have the appropriate license. Otherwise, the results of its work will be declared null and void. Next step – find a contractor that will develop a draft power.
Tags: promyshlennoct and equipmentPosted in News | Comments Off